Oceon recognises the importance to conducts FEED after completion of Conceptual design or Feasibility study, just before the start of E.P.C (Engineering, Procurement and Construction), various studies are carried out to figure out technical issues and also to estimate rough investment cost.

As a continuation from the FEED, further engineering can be done to provide more specific details on the various aspects of the projects.